Premier Greg Selinger says engineers are continuing to look at a sinkhole that swallowed a section of Highway 83 between Russell and Roblin earlier this year.

But Selinger says priority for repairs is being given to roads and bridges damaged by the 2011 flood.
Selinger says he hopes the construction of the flood-damaged bridge on Highway 251 can start in 2013.
A director with the province's Infrastructure and Transportation Department said earlier this year that the sinkhole on Highway 83 had dropped by about seven metres in some places.